Skip to content
Licensed, bonded & insured · CSLB #993188 Serving Los Angeles & Orange County

For HOAs, apartment owners & property managers

SB 326 & SB 721 corrective repairs

Already have an inspection report? We turn documented balcony, deck and walkway deficiencies into an organized repair proposal and practical construction plan.

Balcony opened to expose joists and insulation before repair
Before · Exposed balcony framing
Completed beige AL-Flex waterproof balcony surface
After · AL-Flex waterproofing

Report-to-repair pathway

From inspection findings to a buildable repair scope

Inspection reports identify observed conditions and required follow-up. Our role is to evaluate the repair locations, verify field conditions and price the corrective waterproofing and related construction work that falls within our trade.

For occupied properties, the proposal can be organized by building, elevation, unit or balcony so boards and property managers can understand the scope and plan access.

A clear sequence

How corrective repair planning works

01

Report review

We organize the cited locations, observed deficiencies and requested repair items.

02

Site verification

Access, quantities, surface conditions and visible construction details are checked in the field.

03

Corrective work

Approved repairs are sequenced around demolition, concealed conditions and occupied-property access.

04

Closeout coordination

Completed repair information can be organized for the owner and the inspection professional.

Common repair components

More than a surface coating

The final scope depends on the report, plans, site conditions and what is uncovered during approved demolition.

01

Framing & dry rot

Open approved areas, evaluate exposed conditions and replace damaged framing within the agreed repair scope.

02

Plywood & substrate

Replace deteriorated deck sheathing and prepare a sound surface for the specified waterproofing assembly.

03

Slope & drainage

Review drainage paths, low areas, drains and scuppers so water can move away from vulnerable transitions.

04

Flashing & transitions

Address deck-to-wall flashing, outside edges, door areas and other critical termination details.

05

Waterproofing systems

Install a compatible walking-deck system selected for the substrate, exposure and project requirements.

06

Related coordination

Coordinate defined railing, stucco, door and occupied-property access requirements with the project team.

Inspection and repair are separate responsibilities.

California Decking & Waterproofing provides corrective construction and waterproofing services. Required inspections, engineering decisions and compliance certification remain with the appropriately qualified inspection or design professional.

Have a completed report?

Send it to us and identify the property you need priced.